Analysis of the Progress Control Strategy of Highway Tunnel Project

ZHANG Weia, WANG Minb, SUN Junlinga, ZHAO Xiaa, YANG Pinga, RAN Maohuaa   

  1. a. Faculty of Architectural Engineering; b. Human Resources Department, Kunming Metallurgy College, Kunming 650033, China
  • Received:2016-04-06 Online:2016-07-23 Published:2016-07-23

Abstract:

    Highway tunnel project progress can effectively reflect the implementation of the completion of the highway tunnel project. In the present highway tunnel project management process, time limit for a project control has not represent all construction schedule management.  The project task cost, technical and economic reliability and other factors were combined to consider. Thus the construction schedule management evolved into another kind of index. This new comprehensive index can more accurately show the progress of the highway tunnel project. It is necessary to integrate some other factors in the use of the new comprehensive index. Specific include: (1) strictly in accordance with the requirements of the contract, writing construction schedule; (2) according to the target control of construction schedule management; (3) strengthen the construction schedule tracking and tunnel engineering acceptance; (4) to continuously improve the quality of accounting staff. Improvement methods of highway tunnel construction schedule control include: (1) to strengthen the supply and management of human resource; (2) to strengthen the supply and management of materials; (3) to strengthen the construction equipmentequipmentthe need for planning and management of the work.

Key words: highway tunnel, highway tunnel project progress, engineering construction